Upon arriving at Tennessee Yard, this NS train was departing. |
A couple of views of the north end of the intermodal terminal, showing the spare wheel sets and chassis storage. |
The following sequence shows a production crane picking up a container, sitting it down on a chassis and a mule pulling the chassis to storage. |
The next operation was taking a container from a chassis and placing it as the top layer of a well car. |
Another container from chassis to train. The chassis is seen in the foreground in the next to the last shot. |
Back now to unloading a container from a well car and placing it on a chassis. |
Again unloading a well car, this time with a 20' container. |
This page was designed and is maintained by Mike Condren.
If you have materials
that you would like to contribute, contact me at mcondren@cbu.edu