The cranes have been moved to the north end of the terminal, including the RIP track "Gizmo". |
A third track is being built north which requires another bridge over Winchester Road, 6/25/09. For views of the construction of this bridge. |
This page was designed and is maintained by Mike Condren.
If you have materials
that you would like to contribute, contact me at mcondren@cbu.edu