Recent Digital Photos
by Mike Condren

1/14/10
Passage of stack train from Kentucky Street to Tennessee Yard

The next train is a BNSF stack train which meets a CSX stack transfer for the UP intermodal terminal in Marion, AR.

The stack train is now seen entering the north end of the Tennessee Yard's new Intermodal Terminal. The train stops at the crossing at the end of the terminal and waits for the attachment of the "radio antenna". The train then resumes its trip into the yard.

This page was designed and is maintained by Mike Condren. If you have materials
that you would like to contribute, contact me at mcondren@cbu.edu